Q. Why limited organizations are available in Change Organization window??
Ans: We need to assign organization to the application to access it from that application and the responsibility. Navigation is Inventory (R) --> Setups --> Organization --> Organization Access
Q: What is the use/meaning of Lead Time% in Routing (Main tab), count point, CUM Yield?
Ans: 1. Lead Time % is the % of total lead time taken for that particular operation.
2. Count Point is generally used in Project manufacturing. I am not sure about how does itr affect the functionality.
3. CUM Yield (Cumulative Yield): It is the addition of yield of all the previous operations.
Q. What is supply type=Supplier in BOM?
Ans: It is used for VMI (Vendor Managed Inventory). This is a concept from Lean manufacturing where some vendor/s are asked to maintain their inventory at our place, so that our inventory carrying cost goes down.
No comments:
Post a Comment